![]() *Based on 2018 observed run time data What the Rose Lane Project will do for riders of the Line 14Ĭombined, the completed, funded and proposed Rose Lane projects along the Line 14 could lead to faster trips and help people reach more places: A faster trip ![]() This delay wastes people’s time, costs our system money and keeps TriMet from being able to run more buses in this corridor. ![]() ![]() Download PDF file Download the Line 14 info sheet! 1.54 MB Why is transit priority needed on the Line 14?Īpproximately 6,030 people rode the Line 14 daily in fall 2019.ĭuring the most congested times, each rider’s one-way trip on the Line 14 could take up to 15 minutes longer than normal.Ĭombined, Line 14 buses are delayed for 41 hours each day due to traffic.* If you add that up for all Line 14 riders, that’s 2,779 hours of people’s time lost! ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |